States / New Hampshire / HB 1289

HB 1289 Failed

establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
latest version — · 0 words Open full page ↗

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.