States / New Hampshire / Bill text

Bill text latest version

HB 1289 — establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage.

HB 1289 (latest version)

latest version text of HB 1289.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.