States / New Hampshire / HB 1289

HB 1289 Failed

establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

No summary has been published for this bill. The full text is on the Bill text tab.

Chamber
House
Introduced
Dec 6, 2023
Last action
Jan 17, 2024 — Committee Report: Inexpedient to Legislate 01/09/2024 (Vote 19-0; CC) HC 4 P. 9
Sponsor
Jonah Wheeler D
Session
2024
Momentum
5 · Stalled