States / Washington / HB 2544
HB 2544 Floor Consideration
Concerning a pilot process for the upper Columbia water rights adjudication.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.