States / Washington / HB 2544
HB 2544 Floor Consideration
Concerning a pilot process for the upper Columbia water rights adjudication.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Version comparison
2 versionsSign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.