States / Virginia / HB 1360

HB 1360 Enacted

Investor-owned electric utilities; requirements in fuel factor proceedings conducted with SCC.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Compare versions →
Chaptered — · 195 words Open full page ↗

CHAPTER 310

An Act to establish certain requirements for investor-owned electric utilities in fuel factor proceedings conducted with the State Corporation Commission.

[H 1360]

Approved April 6, 2026

Be it enacted by the General Assembly of Virginia:

1. § 1. That in any fuel factor proceeding conducted with the State Corporation Commission (the Commission) under § 56-249.6 of the Code of Virginia, each investor-owned electric utility shall provide in its initial application (i) all hours during which the investor-owned electric utility committed any of its coal-fueled or oil-fueled electric generating units as must-run units, (ii) the marginal operating costs of such units during each hour when they were designated as must-run, (iii) the reason for making each such must-run commitment, and (iv) the energy market clearing price set by the regional transmission entity for that same hour. Under its existing authority, the Commission shall determine, on a case-by-case basis, whether the decision by an investor-owned electric utility to commit a coal-fueled or oil-fueled electric generating unit as must-run was reasonable and prudent, and the Commission shall deny the recovery of any costs associated with any such decision that the Commission finds was unreasonable or imprudent.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.