States / Virginia / HB 1360

HB 1360 Enacted

Investor-owned electric utilities; requirements in fuel factor proceedings conducted with SCC.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

Investor-owned electric utilities; fuel factor proceedings; requirements. Requires that in any fuel factor proceeding conducted with the State Corporation Commission under current law, each investor-owned electric utility shall provide specific information regarding coal-fueled or oil-fueled electric generating units and requires the Commission to make determinations about reasonableness and prudence for the purposes of cost recovery based on such specific information.

Chamber
House
Introduced
Jan 19, 2026
Last action
Apr 6, 2026 — Acts of Assembly Chapter text (CHAP0310)
Session
2026
Momentum
86 · Very high