States / Texas / HB 805

HB 805 Failed

Relating to a study by the Public Utility Commission of Texas on the interconnection of electric transmission service facilities with the United Mexican States.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

No summary has been published for this bill. The full text is on the Bill text tab.

Chamber
House
Introduced
Nov 12, 2024
Last action
Apr 22, 2025 — Point of order withdrawn (amendment)
Session
89R
Momentum
5 · Stalled