States / Texas / HB 805

HB 805 Failed

Relating to a study by the Public Utility Commission of Texas on the interconnection of electric transmission service facilities with the United Mexican States.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

Version comparison

3 versions

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.