SB 2565 In Committee
Utilities, Utility Districts - As introduced, requires each public and private electric utility and electric project developer, owner, or operator to conduct a technical assessment of certain electrical transformers to determine vulnerability to geomagnetically induced current; requires such entities to file a report on the assessment with the general assembly, governor, board of utility regulation, and the public utilities commission. - Amends TCA Title 4; Title 7 and Title 65.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.