SB 2565 In Committee
Utilities, Utility Districts - As introduced, requires each public and private electric utility and electric project developer, owner, or operator to conduct a technical assessment of certain electrical transformers to determine vulnerability to geomagnetically induced current; requires such entities to file a report on the assessment with the general assembly, governor, board of utility regulation, and the public utilities commission. - Amends TCA Title 4; Title 7 and Title 65.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
No summary has been published for this bill. The full text is on the Bill text tab.
- Chamber
- Senate
- Introduced
- Feb 2, 2026
- Last action
- Mar 10, 2026 — Deferred to Summer Study
- Session
- 114
- Momentum
- 28 · Low