S 2485 Passed First Chamber
Requires the office of renewable energy siting and electric transmission to establish a mapping, installation and efficiency plan for the purpose of building new electric transmission lines
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.