States / New York / Bill text

Bill text S2485

S 2485 — Requires the office of renewable energy siting and electric transmission to establish a mapping, installation and efficiency plan for the purpose of building new electric transmission lines

S 2485 (S2485)

S2485 text of S 2485.

Skip to main content

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.