SF 4901 In Committee
Nuclear power inclusion as an optional resource in a utility's integrated resource plan requirement provision and state application for nuclear-powered electric generating plants requirement provision
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.