States / Minnesota / Bill text

Bill text Introduction

SF 4901 — Nuclear power inclusion as an optional resource in a utility's integrated resource plan requirement provision and state application for nuclear-powered electric generating plants requirement provision

SF 4901 (Introduction)

Introduction text of SF 4901.

Skip to main content

Skip to footer

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.