States / Wisconsin / AB 25

AB 25 Failed

Relating to: an incumbent transmission facility owner’s right to construct, own, and maintain certain transmission facilities and Public Service Commission procedures if the transmission facility is a regionally cost-shared transmission line.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Bill Text — · 0 words Open full page ↗

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.