AB 174 Failed
Relating to: transmission facilities; installation of large wind energy, large solar energy, and battery energy storage systems; installation of light-mitigating technology systems; and prioritizing nuclear energy resources. (FE)
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.