AB 1167 Failed
Relating to: prohibiting recovery of a rate of return on retired electric generating facilities; an exemption from certificate requirements for constructing a large electric generating facility; and a permit dashboard for applications for certificates of public convenience and necessity. (FE)
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.