States / Washington / HB 1712
HB 1712 In Committee
Allowing the use of electricity generated by qualified biomass facilities in the Pacific Northwest to meet renewable resource requirements.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.