States / Washington / HB 1691
HB 1691 In Committee
Extending the water supply milestone for the Yakima river basin integrated plan to 2035.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.