States / Virginia / HB 1467

HB 1467 Enacted

Electric utilities; virtual power plant pilot program, Phase I Utilities.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

Electric utilities; virtual power plant pilot program; Phase I Utilities. Requires Appalachian Power to petition the State Corporation Commission for approval to conduct a pilot program to evaluate methods to optimize demand through various technology applications, including the establishment of virtual power plants, by July 1, 2027. The bill requires the pilot program to evaluate electric grid capacity needs and the ability of such virtual power plants to provide grid services, including peak-shaving, during times of peak electric demand.

Chamber
House
Introduced
Jan 23, 2026
Last action
Apr 13, 2026 — Approved by Governor-Chapter 860 (effective 7/1/2026)
Session
2026
Momentum
86 · Very high