States / U.S. Congress / S 4806

S 4806 Introduced

POWER Up Act

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduced in Senate Jun 17, 2026 · 783 words Open full page ↗

II

119TH CONGRESS

2D SESSION

S. 4806

To clarify that the interconnection of large load facilities directly to facilities

used for the transmission of electric energy in interstate commerce is

a matter within the jurisdiction of the Federal Energy Regulatory Com-

mission.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.