States / U.S. Congress / S 4559

S 4559 Introduced

Energy Cost Fairness and Reliability Act of 2026

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduced in Senate May 18, 2026 · 6.1K words Open full page ↗

II

119TH CONGRESS

2D SESSION

S. 4559

To amend the Federal Power Act to require the Federal Energy Regulatory

Commission to issue a final rule relating to the interconnection of large

load facilities with the transmission system, and for other purposes.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.