States / U.S. Congress / HR 9843

HR 9843 In Committee

Enhancing Electric Grid Resilience Act

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduced in House Jul 22, 2026 · 713 words Open full page ↗

I

119TH CONGRESS

2D SESSION

H. R. 9843

To amend the Federal Power Act to authorize the allocation of the costs

of certain interstate electric power transmission lines and electric power

transmission lines that are located offshore, and for other purposes.

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.