SB 6 Failed
Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Version comparison
5 versionsSign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.