SB 6 Failed
Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
No summary has been published for this bill. The full text is on the Bill text tab.
- Chamber
- Senate
- Introduced
- Feb 12, 2025
- Last action
- May 23, 2025 — Point of order withdrawn
- Session
- 89R
- Momentum
- 5 · Stalled