States / Texas / HB 3157

HB 3157 Passed First Chamber

Relating to interim rates charged by electric utilities during a rate suspension period.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Compare versions →
Engrossed — · 722 words Open full page ↗

89R23321 SCR-F

By: Darby

H.B. No. 3157

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.