SB 962 In Committee
Energy - As introduced, requires an applicant and an electric utility service to perform and submit to the locality a site assessment prior to the approval of a rezoning request, special exception, or special use permit for the siting of a new high energy use facility (HEUF). - Amends TCA Title 5; Title 6; Title 7; Title 13; Title 54; Title 65 and Title 68.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.