S 1925 In Committee
Requires continuous work until completion for the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Provides that in the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority, work shall take place over a continuous period of time until such point at which the project has been completed.
- Chamber
- Senate
- Introduced
- Jan 14, 2025
- Last action
- Jan 7, 2026 — REFERRED TO TRANSPORTATION
- Session
- 2025-2026
- Momentum
- 33 · Low