States / New York / A 232

A 232 In Committee

Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
A232 — · 376 words Open full page ↗

Skip to main content

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.