States / New York / A 232

A 232 In Committee

Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external automatic cutoff switch.

Chamber
House
Introduced
Jan 8, 2025
Last action
Jan 7, 2026 — REFERRED TO GOVERNMENTAL OPERATIONS
Session
2025-2026
Momentum
27 · Low