States / New York / A 1443

A 1443 In Committee

Requires standards for the new construction of commercial electric vehicle charging stations to require such stations to have an external cutoff switch

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
A1443 — · 380 words Open full page ↗

Skip to main content

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.