A 10134 In Committee
Requires the office of renewable energy siting and electric transmission to promptly publish applications for permits to site a major renewable energy facility or to site a major electric transmission facility
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Requires the office of renewable energy siting and electric transmission to promptly publish applications for permits to site a major renewable energy facility or to site a major electric transmission facility.
- Chamber
- House
- Introduced
- Feb 3, 2026
- Last action
- Feb 3, 2026 — REFERRED TO ENERGY
- Session
- 2025-2026
- Momentum
- 26 · Low