States / Nevada / AB 32

AB 32 Floor Consideration

Directs the Joint Interim Standing Committee on Growth and Infrastructure to conduct a study during the 2025-2026 interim concerning the Nevada Commission for the Reconstruction of the V & T Railway of Carson City and Storey County. (BDR S-404)

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
As Introduced — · 734 words Open full page ↗

A.B. 32

ASSEMBLY BILL NO. 32–COMMITTEE

ON GROWTH AND INFRASTRUCTURE

(ON BEHALF OF CARSON CITY)

PREFILED NOVEMBER 15, 2024

____________

Referred to Committee on Growth and Infrastructure

SUMMARY—Directs the Joint Interim Standing Committee on

Growth and Infrastructure to conduct a study during

the 2025-2026 interim concerning the Nevada

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.