AB 32 Floor Consideration
Directs the Joint Interim Standing Committee on Growth and Infrastructure to conduct a study during the 2025-2026 interim concerning the Nevada Commission for the Reconstruction of the V & T Railway of Carson City and Storey County. (BDR S-404)
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.