States / New Jersey / S 3399
S 3399 In Committee
Directs BPU to establish virtual power plant program to reduce peak demand for electric energy.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.