States / New Jersey / A 4859
A 4859 In Committee
Specifies that prior SADC approval is not required in order to authorize construction, installation, or operation of biomass, solar, or wind energy generating facilities, structures, or equipment on farmland preservation exception areas.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.