States / Minnesota / HF 369

HF 369 In Committee

Requirement for electric utilities to meet the renewable energy, solar, or carbon-free standard delayed under certain conditions; and demolition of fossil-fuel-powered electric generating plants prohibited under certain conditions.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduction Feb 11, 2025 · 1.6K words Open full page ↗

Skip to main content

Skip to footer

Minnesota Legislature

Advanced

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.