HF 2986 In Committee
Additional information in a public utility's resource plan required, public utilities directed to file a virtual power plant tariff and program with the Minnesota Public Utilities Commission, cost recovery provided, and reports required.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.