States / Minnesota / HF 2986

HF 2986 In Committee

Additional information in a public utility's resource plan required, public utilities directed to file a virtual power plant tariff and program with the Minnesota Public Utilities Commission, cost recovery provided, and reports required.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduction Mar 28, 2025 · 3.3K words Open full page ↗

Skip to main content

Skip to footer

Minnesota Legislature

Advanced

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.