SB 1048 In Committee
Public utilities: electric utilities; project labor agreements and prevailing wage and fringe benefit rates; require for certain data center contracts. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10ii.
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.