States / Louisiana / HR 404

HR 404 Introduced

INFRASTRUCTURE: Urges and requests that Louisiana utilities assess their electric grids for vulnerabilities to ground induced currents

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
HR404 Original — · 838 words Open full page ↗

HLS 26RS-3282 ORIGINAL

2026 Regular Session

HOUSE RESOLUTION NO. 404

BY REPRESENTATIVE CREWS

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.