HB 641 Passed First Chamber
Public utilities; require electric supplier to hold the proposed discontinuation of electrical service to a residential customer who suffers from a serious illness in abeyance for a certain period of time
Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.