States / Georgia / HB 1063

HB 1063 Failed

Electric utilities; protect residential and retail electricity customers from costs associated with data center construction and operation; require

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

Version comparison

3 versions

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.