States / District of Columbia / PR 26-0172

PR 26-0172 Failed

District of Columbia Water and Sewer Authority Board of Directors Laurence Gill Confirmation Resolution of 2025

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduction — · 0 words Open full page ↗

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.