States / Colorado / HB 1420

HB 1420 Enacted

Wind Energy Facilities Light-Mitigating Technology

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted

In 2022, the general assembly enacted Senate Bill 22-110, concerning a requirement that a wind-powered energy generation facility be equipped with light mitigating technology (technology), to require an owner or operator of a new wind-powered energy generation facility (facility) to install technology at the facility and to obtain federal aviation administration (FAA) approval before installing the technology. An owner or operator of a facility can request from the governing body of the local government in which the facility is located an extension of up to 24 months to install the technology. The act requires the owner or operator of a facility to also obtain federal communications commission (FCC) approval for installation of the technology and requires that a governing body of a local government grant an owner or operator of a facility an extension of time to install the technology if FAA, FCC, or other federal agency approval is delayed.

The act also requires that an extension of time granted by the governing body of a local government is at least 24 months in duration.(Note: This summary applies to this bill as enacted.)

Chamber
House
Introduced
Apr 21, 2026
Last action
Apr 21, 2026 — Introduced In House - Assigned to Transportation, Housing & Local Government
Session
2026A
Momentum
98 · Very high