States / California / AB 710

AB 710 Failed

Electrical corporations: resiliency planning: microgrid projects.

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Compare versions →
AB710 — · 0 words Open full page ↗

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.