States / Alabama / HB 137

HB 137 Floor Consideration

Contract Review; exemptions from review of executive branch contracts, require Governor to certify the need for exemption from contract review

Introduced
In Committee
Floor
Crossed Over
Passed
Enacted
Introduced — · 0 words Open full page ↗

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.