States / Texas / Bill text

Bill text Engrossed

HB 386 — Relating to change order limits for certain construction contracts.

HB 386 (Engrossed)

Engrossed text of HB 386.

89R3615 CS-F

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.