SB 998 — Public utilities; cost of transmission upgrades; modifying application process for construction of certain facilities; establishing cost recovery provisions.
SB 998 (Introduced)
Introduced text of SB 998.
Sign in to read the full text
The document summary and details above are public. The full text is available to signed-in accounts.