States / New Jersey / Bill text

Bill text Introduced

A 720 — Extends from 190 to 280 days the time within which developers are to file plat or deed conforming with minor subdivision approval.

A 720 (Introduced)

Introduced text of A 720.

ASSEMBLY, No. 720

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.