States / Minnesota / Bill text

Bill text Introduction

HF 4990 — Criteria for preapplication evaluations of water appropriations for certain data centers modified, data centers' electricity sales exempted in calculating a utility's solar energy standard, other data center exemptions provided, and data center energy generation redundancy provided.

HF 4990 (Introduction)

Introduction text of HF 4990.

Skip to main content

Skip to footer

Sign in to read the full text

The document summary and details above are public. The full text is available to signed-in accounts.